LSI Companies, Inc. is pleased to present two new construction rear-load dock-high industrial warehouses located directly at the southwest corner of SR-82 and I-75.
• Units starting at 6,750 SF with grey shell delivery.
• Spaces offer:
- 36’ clear height
- 52’ x 35’ column spacing
- Total building depth 130’
- 60’ rear tuck parking
- 12’ x 14’ drive in doors via ramp and 9’ x 10’ dock high overhead doors
- All dock positions are set up in speed bays
- Storefront doors and optional office
- Rear-load building configuration with 60’ rear parking
• Tilt up concrete construction with TPO roof.
• Delivered with 400 amp 3-phase power, code-compliant LED lighting, hurricane and storm protection with impact-resistant glass, and fully functioning ESFR fire suppression system.
• Unparalleled visibility on corner of I-75 and SR-82.
• Limited truck competition access into Alessio Trade Center.
• Join tenants such as Gerzeny R. V. World, ACE Pickleball, Glendale Supply, Cusano, Mitra9, B&B Cool Air, and Florida Conquer Volleyball Club.
Building 1:
• Completed 129,000± Sq. Ft.
• 6,750 - 27,000± SF
• Commencement end of January 2025
Building 2:
• Proposed 112,000± Sq. Ft.
• 6,750 - 91,950± SF
• Anticipated delivery Q3 2025.