Own one or both buildings in one of the most desirable spots in Longmont! Have fantastic visibility directly from thousands of cars driving by on Hwy 119 every day. Only minutes away from major Hwy I-25. Built for 53’ semi-trucks delivery. Construction estimated to be complete in April/May 2025.
Both buildings will have dock-high and grade-level doors with a low clearance of 26’ and a high of 32’. Fantastic opportunity for an owner user to looking for a new home in the fast growing Longmont community.