Location: NEC of John King Blvd and FM 552
Size: 17.37 Acres
Zoning: Commercial – see PD attached as separate file
Utilities available to the site
Water: 16” line running along John King Blvd and FM 552
Sewer: 8” connection on John King Blvd that was put in with Phase 10 Storm: Detention is likely required. Will connect to storm system on John King Blvd
Flood Plain: no floodplain on the property
Topography: slopes towards intersection of John King and FM 552
Soils: Per the soils report completed by EWI for BH Phase X (bordering property to the north) the PVR is in the order of 3 ½ inches. Report on adjacent parcel attached as separate file.
Tree Mitigation: Requirement has been met with SF landscaping in PD.
Water Impact Fee: Estimated by the City of Rockwall to be $39,000
Sewer Impact Fee: Estimated by the City of Rockwall to be $31,000
TXDOT: See attached Exhibit “G” showing preliminary schematics of improvements proposed for FM 552 and the intersection of FM 552 and John King Boulevard.
Concept Plan: See attached conceptual site plan prepared by GSO Architects for the site.