Prime Development Opportunity Located in South Austin
• The site is located less than a mile North of Southpark Meadows, a 180+ acre mixed-use shopping area with a recently added 126k sf. HEB. • Construction began in late 2022 on the I-35 Capital Express South project, adding elevated managed lanes between SH-71 & Slaughter Ln and constructing a Southbound I-35 bypass lane that will allow traffic to bypass Stassney Ln & William Cannon Dr. The project is expected to be completed by 2028.
Close Proximity To Major Thoroughfares
• Site is located less than a mile West of I-35 with direct access via Slaughter Ln
• 4 miles Southwest of SH-71
• 4 miles South of Loop 360/US-290 corridor
• 4.5 miles East of Mopac
• 4.5 miles North of TX-45
• 6 miles West of US-183
• 8 miles West of TX-130
Direct Access Across the Austin Metro Area
• Sunset Valley/Arbor Trails: 12 minutes
• ABIA: 15 minutes
• South Congress (SoCo): 15 minutes
• Buda: 15 minutes
• Downtown Austin: 18 minutes