±220,000 SF Temperature Controlled Production with ±347,362 SF Distribution Center
Headquarters Grade Office
Over $120 Million in Facility Upgrades
Robust Production Infrastructure & Utilities: 140,000 GPD Wastewater; 16,000 Amps; CIP Systems; Boilers; CO2 and Nitrogen Lines; Hot and Chilled Process Water
Virtually all equipment is unused
Ideal uses: food manufacturing, food processing, food production; beverage; coffee; snacks; bakery; USDA or FDA production; pharmaceutical manufacturing, pharmaceutical processing, pharmaceutical production; advanced manufacturing; automated manufacturing; data center
Key features include: Labs, Construction: Tilt-Wall, 140,000 GPD Wastewater; Heavy Power - 16,000 Amps; CIP Systems; Boilers; CO2 and Nitrogen Lines; Hot and Chilled Process Water; Compressed Air; Tanks; Labs; Drains; ESFR;