Spec Biotech / Life Science conversion delivering June 2024. Spec lab being built per the plans.
• Brand New Spec ~35K SF Life Science Conversion
• Base Building Improvements to accommodate lab
• Exterior Façade Renovation to include a new glass curtain wall on the front of the building
• New 2-Story Lobby
• Refreshed Landscaping
• Large terrace on the 2nd floor
• Strong Ownership Team with Proven Life Science Track Record
LAB SPECS
10ft dropped ceiling in lab area - (clear to deck is 23ft)
9ft dropped ceiling in office areas
Benching and casework included in spec build in the majority of the lab area
Labs to include three (3) new VAVs with 100% outside air and airflow rate of 9 ACH per hour
Two (2) new heating hot water boilers will include N+1 redundancy on the boilers as well as the pumps
House Vacuum and Compressed Air included in spec
Fume Hood - One (1), 6-ft hood and capacity for 3 additional
Power - 2000A 480/277V (3000A of 208/120V)
Back-up Generator - 150kw