Video https://youtu.be/UIX5DbFxnDI
Package Attached
Zoned Land: 340 ac Zoned Industrial (Data Center, Manufacturing, Warehouse)
Industrial approved for over 4,000,000 sf of buildings
110 acres, approved 540+/- units (20 ac Town-home, 85 ac Single Fam, 5 acres Commercial).
Water, Sewer, Power easement forthcoming
Completed:
1. ALTA survey completed.
2. Preliminary Plat completed and approved by the City of Wilmer
3. Zoning completed. 340 acres zoned Industrial. 110 acres mixed use Residential.
4. Concept Plans completed for both 340 acres Industrial land and 110 acres Residential Land
5. Detailed Estimated Cost summary: Roads, Water, Sewer, Drainage, etc.. See multiple tabs within the Excel spreadsheets.
6. Original Phase One completed.
7. Base Utility Plans completed.
8. Property Package attached.
9. Roberts Road Abandonment documentation completed.
10. Trinity River Authority (TRA sewer) & City of Wilmer agreement completed and signed.
11. Oncor, Atmos information attached.
12. Water Study completed.
13. Mars Rd water right of way dedication engineering completed.
14. Sewer easement engineering 70% completed.
Call for Pricing Landowner Bill Olsen 602-430-7002 Bob Ikel Agent IC3 214-557-5252