Building Features
Zero Deferred Maintenance
This former multi-tenant medical building underwent a complete renovation in 2019 of $1,950,000.00 USD to become a state of the art materials and forms light manufacturing/assembly center for mechanical and electro mechanical assemblies and sub-assemblies. No detail was overlooked in a complete overhaul of all systems and class A finishes. A great opportunity for any distribution or light manufacturing operation to the East and North corridors.
Heating and Cooling
· Heating and Cooling Units Manufacturing Floor
· 3-180000 BTU Propane heating / electric cooling units
· Heating and cooling unit’s, offices, conference room, cafeteria, and bathrooms.
· 1-Mitsubishi VRF heat pump system. Model# PUMY-HP48NKMU1
· Cooling system for IT room
· 1-Mitsubishi VRF heat pump system. Model# PUY-A12NKA7
· Heating and cooling system for Engineering and Quality Assurance rooms.
· 1-Mitsubishi VRF heat pump system. Model# PUHY-EP144TNU-A.TH
· All rooms individually thermostatically controlled.
Security
· 32 Camera surveillance system inside and outside.
· Full motion sensitive security alarm system
· All access doors controlled by central security badge system.
· Automatic exterior lighting system
Utilities
· Town Water
· Town sewer
· 2 – 1000 gallon underground propane tanks
· 1200 Amp 208 volt 3 phase power
· Wired high speed internet
· Fiber optic internet wired into building
· Fire alarm system wired to fire department and cellular.
· Excellent cell reception
Structure
· Manufacturing concrete floor is 6” with epoxy finish
· All walls have been spray foamed for insulation
· New sprinkler system
· All new wiring
· All new LED lighting
· All new plumbing and fixtures
· Roof over offices is new foam composite.
· 2 mezzanines
· Climate controlled IT room
· 7 bathrooms, 3 men’s, 3 women’s and 1 handicap
· Elevator fully in service down to cafeteria and workout room
· Cafeteria with full kitchen
· Shower room
· Slop sink closet
· Eyewash station on manufacturing floor
· Hand washing fountain on shop floor by bathrooms
· 3 bay stainless wash sink on manufacturing floor
· AirNet compressed air piping systems throughout building
· 50 Amp service wired to outside junction box for future EV charging stations
Access doors
· 1 – 12’ x 12’ ground level overhead door with electric operator
· 1 - 8’X 8’ X 4’ dock height loading door with electric operator
· 1 – 12’ x 24” dock height exterior loading ramp
· 2 - 8’ X 8’ Overhead doors with electric operators in out building
· Wheelchair ramp access
Property
· Located at the end of the off ramps from route 2
· 20 x 25 garage building with new roof and garage doors
· 110 parking spaces
· 12 acres of land with room to build another 250’ of building
· 400’ of frontage on the Millers River, Excellent fishing!
Available equipment
· Tennco floor scrubber
· Skyjack
· 4 Atlas Copco air compressors totaling 100 Horse power with 1000 gallons of air storage and dryer.
· Shelving and pallet racks
· 5’ x 18’ granite conference table with leather chairs