currently being developed for Data center/ HPC applications. 408A 3ph electrical service for a 1.3MW operation has been contracted. The cooler temperatures of Wisconsin will aid in natural cooling. There is also a natural source of groundwater at 51F for process cooling or LEED certification purposes. Solar panels are also scheduled for a renewable energy adder!. the main building consists of nearly 4000 sq ft per floor. The all-masonry structure aids in cooling and noise absorption. Heat costs will be absorbed by excess process heat
WPS WI electric rate Cg-20RR is as low as .05/kWh .
Main floor office/ flex available for lease as well.
Fiber optic internet at site. facility is sized for up to 90 Bitmain U3S21 EXP Hydro computers in the lower level alone. Since these computers are so quiet, noise is no longer an issue. Photos of data center available to qualified candidates.
Net income projected at over one million USD annually.
#Bitcoin #Bitcoin mining #HPC #Data Center #crypto #Cap Rate #antminer #whatsminer #digital #cash flow #passive income
Cash flow positive with plenty of room for increase!