Site Features:
– ±63,152 SF Total
– ±6,184 SF Mixing Warehouse
– ±10,790 SF Tank Farm (21 Tanks Total)
– ±14,860 SF Warehouse/Office
– ±7,000 SF Dry Warehouse #1 & ±16,690 SF Dry Warehouse #2
– ±910 SF Locker Rooms
– ±1,422 SF Guard Shack
– ±5,296 Overhand Truck Weighing Station
– Previously an overbasing carboxylation plant (equipment available
for reuse / purchase)
– Rail spur confirmed capable (rough pricing in hand)
– 3 water wells, 3 ponds & on site septic
– 2 air compressors on site
– 2-ton hoist within Process Center 1 & (2) 3-ton hoists
– 4 cooling towers (2005 or later)
– Located in Walker County (Unincorporated area between Huntsville
and New Waverly)
– Transformer on site rated at 500 KVA (upgradable)
– Reverse osmosis water system for filtering (80,000 gal/day capacity)
– (1) Dock high Loading
– LED Lighting
– Centerpoint Energy power
– Synergy Natural Gas
– Fully fenced (7’ high)