The campus at Wichita Falls is a sprawling 220-acre future data center campus ready for lease and has undergone
a comprehensive due diligence process, which has identified minimal development risks. Adjacent to Oncor’s City
View Switching Station and triple 138kV transmission lines, the campus offers a potential 591 MW load capacity
within Oncor’s service area, with an initial 55 MW available in the short term. The in-place Light Industrial zoning
has no FAR or height limit, allowing for significant expansion. The unencumbered land footprint allows for flexible
site designs and layout options. With abundant fiber networks, the campus provides a high -value alternative to
the congested Dallas Fort Worth Corridor.
Scalable Data Center Opportunity