70 acres-Perfect area for a Data Mining Center with 9 mo. lead time, according to AL Power! This was previously a Port-Timber Loading Facility and it will accommodate structural steel or pipe, super sack, coal or other bulk materials.
Barge Loading facility with Office Building 3200 sf with 6 offices, large conference room, scale room, reception area, bathrooms and kitchen area. Includes Shop Building-2400 sf with offices, bathroom and break room, roll-top door and storage with a wash-down area outside. Dry Storage-7500 sf. 21 ft high, enclosed on 3 sides with 12'' floor Dock Facilities- 2600 ft long waterfront with pylons and barge tie-ups. Crane pad was dug out to bedrock and drilled, keyed, laced with rebar and poured with concrete. The laydown area is 8 ft higher than the crane pad to allow loads to clear empty barges. Bulk storage area-cement pad in a semicircle with a backstop will hold 4 barge loads of chips. It has 2 feed-out pits. An adjacent tract with 850 ft of waterfront has been added to this description to increase the acreage. AL Power has pinpointed an adjacent site that will handle a substation with direct flow to a potential Data Center Site with the necessary wattage. Also, Natural Gas is available on the adjacent parcel which could house a gas turbine.
CLIENT WILL SELL FOR $5.5M or lease for Long Term Triple Net Lease- This GIS site will enable you to navigate the area and print off any additional maps you may need to review: https://arcg.is/1GXbLj