HEAVY POWER SITE FOR INDUSTRIAL, MANUFACTURING & BITCOIN MINING - TURNKEY & POWER READY!!
Former Georgia-Pacific processing facility. Currently being operated as a bitcoin mining site with 2.25 MW of 3.25 MW energized. Transformers on for all 3.25 MW are on site and included in the sale. Estimated power cost is $0.045 KWH, billed as actual.
POWER-LOAD CAPACITY EXPANSION:
Fully Approved by FirstEnergy (Penn Electric) for 100 MW. Transmission Load Study has been completed. Utility Substation is 1.4 miles away. Utility will bring 115kV high-voltage line to the site. Utility has no must-takes, power billed as actual. PA is deregulated therefore power blocks can be purchased on open market. Estimated power cost is $0.045 KWH - contracted capacity will directly impact power cost.