According to our preliminary discussions with First Energy in 2021, the site had a power capacity of 3-5 megawatts. This capacity could be increased to 8-10 megawatts with the necessary substation upgrades.
Furthermore, a nearby 138 kV line could boost the power capacity to an impressive 25-50 megawatts if utilized in conjunction with additional
substation upgrades. This potential for high power capacity makes the site particularly attractive for energy-intensive industries.
Rail access is available via the Wheeling and Lake Erie Railway, offering a crucial logistical advantage for transporting goods and materials. The site also benefits from access to fresh water from the river, ensuring a reliable supply for various industrial processes and operational requirements.
With its strategic location, substantial power capacity, dependable water supply, and excellent rail access, this industrial land site presents a compelling opportunity for redevelopment. Whether for manufacturing, logistics, or other industrial applications, the site's potential is immense and ready for transformation.