The site is serviced with drilled well, septic system, holding tank, and heavy power ( 3 separate transformers of 3,000 Amps each, Main Power is 44,000 volts stepped down to 13.2000 volts. Each transformer is 13.2 kv to 600 Kv and each one is 2.5 megawatts). The facility is located on approx. 13.89 +/- acres which includes a combination of 13 buildings on the site totaling 74,774 SF +/- of varying dimensions. Allaire Road is paved and not subject to half load restrictions. There are 3 entrances c/w +/- 4 acre gravelled yard, partially fenced. Recently built 371,000 usg holding tank for fire protection connected to a sprinkler system servicing much of the plant + dry chemical sprinkler services other areas of the facility.