This ±2.53-acre parcel is strategically located in the growing Sloan submarket on Schuster Street, with immediate access to I-15 via Sloan Road. It is also located adjacent to the future Brightline Vehicle Maintenance Facility (VMF). The VMF is a ±200,000 SF building situated on 238 acres that will be the base for daily maintenance and staging of trains. The following websites have additional details on the project: https://www.gobrightline.com/press-room/2024/brightline-west-breaks-ground-on-americas-first-high-speed-rail-project-connecting-las-vegas-to-southern-california, https://www.dot.nv.gov/projects-programs/transportation-projects/brightline-west-high-speed-rail-project. The I-15 South widening project is also underway from Sloan Road to North of Warm Springs Road (https://www.dot.nv.gov/projects-programs/transportation-projects/i-15-south-project).