Discover a versatile commercial property in the heart of North Miami Dade County, offering exceptional potential for various business ventures. Currently configured as a medical surgical center, this 15,212 square foot building presents a unique opportunity for healthcare professionals, but its prime location and extensive features make it equally suitable for retail or restaurant use. Situated on a 1.48-acre parcel with high traffic visibility, the property boasts easy access to Route 95, ensuring seamless connectivity to major highways and nearby amenities. Notably, the property is positioned directly across the street from a popular Starbucks, enhancing its appeal for businesses that thrive on customer convenience and foot traffic.
The building is equipped with a robust infrastructure, including a generator that powers the entire property and a newly installed, fully automated HVAC system—both just three years old. These upgrades, along with an alarm and keypad entry system and partial fencing, ensure security and operational efficiency. While the property does not include the existing medical equipment, the owner offers flexibility with the option to purchase the equipment separately or have it removed entirely.
This property is an exceptional investment for those looking to establish a strong presence in a thriving commercial area. Whether you envision a continued medical use, or you’re considering converting the space into a dynamic retail or dining establishment, this location offers the flexibility and features needed to support your vision.
This is a rare opportunity to acquire a well-positioned property with extensive potential in a bustling area of Miami. Don’t miss the chance to secure a versatile space that can be tailored to meet the specific needs of your business.
Facility Details
• 15,212 square foot block with brick face construction
• 5 Operating Rooms
• 3 Procedure Rooms including FEMTO laser
• 12 Recovery Beds
• 6 Preoperative Bays
• 7 dedicated office spaces
• 5 cubicle business office space
Building Specifics
• TPO flat vinyl roof replaced in 2016
• 3 roof mounted AC units in 2022
• Chiller replaced in 2017
• Upgraded DDS (direct digital control) system
• Medical gas room outside and secured
• 150kw generator rebuilt in 2021 powers the entire building
Additional Details
• New front entrance aluminum frame, glass, and doors in 2023
• New fire doors for OR rooms and entrance/exit doors ordered and delivered in 2023
• 2 dedicated secured storage rooms for medical supplies
• Large separated storage area for medical equipment
• Covered drive-thru patient pick-up area
• Double rear entrance doors to allow large pallet deliveries
Additional Spaces Summary:
Bathrooms 8
Storage Rooms 5
Utility Rooms 6
PACU Bays 11
Sterilization Rooms 3
Medication Rooms 2
Dressing Rooms 2
Conference Rooms 1
Dictation Rooms 1
Biohazardous Rooms 1
Fire Riser Rooms 1
Electrical Rooms 1
Staff Lounges 1