22.3 acre parcel with 15+/- acres for development. Property is zoned I-P. Site contains a constructed water detention pond capable of servicing entire site. Has had prior site-plan approval from Orion Twp. (shown for reference) including 3 buildings, over 200,000 square feet of building space and approaches from Silverbell Rd. and Giddings Rd. Prior soil boring test and environmental test available. Close proximity to I-75 and M-24. Across Silverbell Rd. from General Motors Orion assembly facility. Close proximity to other manufacturing and high-tech, including ABB, Dana, FedEx, Esys Automation, Continental AG, Webber Automotive, Rousch Industries, Delta, Society C, and others. 12 miles from Oakland-Pontiac Airport. Possible additional potential for use as Cannabis Cultivation/Grower Facility, Secure Transporter, Processor or a Safety Compliance Facility per current zoning. Please contact listing broker for additional information. Flat, level topography, retention basin on site. Natural Gas, Water and Sewer and Electric available. Previous soil boring and environmental test results available. Orion Township tax abatements may be available - guidelines in the document folder.