Located within the city limits of Baldwin, this property is located less than a mile South from the soon to be completed Baldwin Bypass & SR-200 tie in, 1 mile North of Beaver Street (US 90) and 2 miles North of I-10. The SR-200 tie in will allow for easy and timely access to the I-10/US Hwy 301 Interchange as the roads are being widened to provide 4 lanes of travel.
*Master planned industrial park
*Heavy industrial zoning
*All entitlements in-place
*All utilities are ran into the park
*Shovel ready sites
*Fast track construction permits through the Town of Baldwin