Welcome to Frostproof Business Park, where connectivity meets capacity in the heart of Florida. Ideally positioned at the crossroads of Hwy 17, Hwy 27 and Hwy 60, our 500-acre park is a prime location for logistics, manufacturing, cold storage, data center, or R&D. Fully customizable Class A buildings, with direct railway access, ranging from 89,250 to 2,015,000 square feet, designed to support heavy power, natural gas, fiber-optic and large water capacity, as well as IOS available on site.
Electricity: Supplied by Duke Energy, our park is served by two robust 12.47-kV distribution lines and a 69-kV transmission line, ensuring reliable power across the park. The nearest substation offers a substantial capacity of 25 MW, catering to high-power requirements and future expansions.
Water Services: Managed by the City of Frostproof, our facilities benefit from a 12-inch waterline with an excess capacity of 450,000 gallons per day (GPD), providing more than adequate water supply for your operational needs.
Wastewater Management: Also provided by the City of Frostproof, our park is equipped with a 4-inch wastewater line. This system supports an excess capacity of 250,000 GPD, facilitating efficient waste management and sustainability practices.
Natural Gas: TECO People’s Gas supplies natural gas with available capacity for light industrial use. Extensions of the gas line can be accommodated to meet specific energy requirements, ensuring flexibility and scalability for growing businesses.
Telecommunications: With fiber-optic infrastructure adjacent to our site, connectivity can be readily extended into each facility, offering high-speed internet and telecom services to keep your business connected and competitive.
Incentives: The region also boasts a pro-business tax climate and offers a host of incentives on the local, regional and state levels to help businesses flourish in Central Florida’s Polk County, reach out to CFDC or listing broker for more information.